New trail system going in at PowMow- Mtbr.com
Results 1 to 3 of 3
  1. #1
    mtbr member
    Reputation:
    Join Date
    Apr 2015
    Posts
    26

    New trail system going in at PowMow

    I rode the brim trail at pow mow for the first time today. The trail blew me away with the quality of what they are building. 6 miles of mellow singletrack at 8500' about 500' elevation delta. Its a beautiful ride the foreground is filled with wildflowers all over the place. The background is the wasatch back to the south and the bear river range to the north. The trail flows perfectly with A and B line options that let you go over some small jumps or rocks for just enough challenge. Some of the trial builders were out today and their passion to riding is apparent in the trail its self.

    They are have another section already in progress to connect to the upper lodge to avoid the construction. I can't wait to see whats next.

    I didn't stop to take pictures.

    Here is the writeup from Utahmountainbike.com

  2. #2
    Perpetual n00b
    Reputation: dgw2jr's Avatar
    Join Date
    Aug 2011
    Posts
    1,775
    The leg bone's connected to the Cash Bone!

  3. #3
    I didn't do it
    Reputation: Mookie's Avatar
    Join Date
    Feb 2008
    Posts
    9,461
    This really encouraging to see that Powder Mtn is actually going forward with their trail building plans. Keep it up!
    Let's eat Ted
    Let's eat, Ted
    Remember, commas save lives

Similar Threads

  1. The McCoy Flats Trail System (60 miles of trail in eastern Utah) is looking for input
    By Jasonoutside313 in forum Trail Building and Advocacy
    Replies: 5
    Last Post: 05-16-2014, 09:49 PM
  2. New mtb trail system in NE OH
    By swampboy62 in forum Midwest - IL, IN, OH, KY, IA, MO, MI
    Replies: 15
    Last Post: 02-25-2013, 07:36 AM
  3. Replies: 95
    Last Post: 02-13-2012, 09:12 AM
  4. Replies: 12
    Last Post: 01-10-2012, 10:56 AM
  5. Replies: 29
    Last Post: 01-09-2012, 12:33 PM

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.