Mountain Bike Reviews Forum banner

Black Canyon Trail Bulding Event - March 7

625 views 6 replies 3 participants last post by  Epicrider 
#1 ·
Only two more BCT work events before the season gets to hot to work. Two weeks ago we only had 8 workers, but we kick but and built 800' feet of trail!! Iwas was easy digging with onlt a few rocky area to pick thru. More of the same this Saturday. We will be working on the Arrasrei Creej section which is north of Black Canyon City and only have about 3 miles of trail to build to get to Bumble Bee. :thumbsup:

Here are a few pics from two weeks ago.

Date: March 7, 2009
Time: 8:00 AM
Meet At: BCC Trailhead, Black Canyon City, AZ.
Work Location: Arrastre Creek Segment of the Black Canyon Trail
Contact Information: Bob@bctaz.org

Activities: Construct non-motorized trail using accepted trail building techniques and hand tools along previously flagged route.

This is a physical activity requiring certain health and safety considerations. Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.

Bring sun screen, your own soft or sports drinks and snacks. We will provide bottled water and lunch.

Tools to be used: Pulaski, McCloud, shovel, pick mattock, limb lopper and pruning saw. Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.

Directions: From Interstate 17, either direction: take exit 242 (Black Canyon City), turn west, proceed to stop sign, then turn north on the frontage road, drive approximately 290 ft to the first road on left, turn left on Warner Rd, drive approximately 1290 ft to first crossroad, turn right and proceed approximately 430 ft to parking area at the end of the road. Directional signs will be posted.
 

Attachments

See less See more
5
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top