Disciples of trail work- Mtbr.com
Results 1 to 3 of 3
  1. #1
    mtbr member
    Reputation: General Coonskins's Avatar
    Join Date
    Jan 2004
    Posts
    1,019

    Disciples of trail work

    The Trail clearing Disciples strike again, this past weekend we had the small army I was hoping to get. Friday we had 10 people, Saturday we had 26 and Sunday 24 people. It was pretty awesome to see everyone showing up at the Trailhead Coffee House each morning. We opened up more of the local loops, finished off several from last month and worked on some old favorites in need of repair.

    There are so many people to say thank you to. I hope no one slipped under the radar this weekend and I didn't get you on the trail maintenance list, if so please drop me a note right away.

    David and Becky at the Trailhead Coffee House in Oakridge helped out once again with over 30 sandwiches, fruit, trail mix and other goodies for the weekend. I also want to say thank you to all their staff, Tamara, Primo, Paula, and Joshua, as well as several I don't know, they did a wonderful job helping this weekend go by smoothly. It has turned into an excellent place to meet and head out for the day. They have also been kind enough to offer some parking if you wish to do a ride from there, please check with them before heading out and make sure they have the room for the day to leave a vehicle.

    The weekend was full of trail work, rides, and partying. Numerous folks stayed up Friday and Saturday nights to make for an exciting end to each day.

    I have also been asked to pass along numerous other thank you's from all the other volunteers to the Trailhead Coffee House.

    Clif Bar was also on hand with a couple boxes if bars to help fuel the hard working crews.

    My best way to say thank you to everyone that made it up for the weekend is offer up this report that is being sent into the Forest Service. Also don't forget we will be doing this in April/May (April 30th - May 2nd), I will be up there for the entire weekend again making sure there is an opportunity for everyone to come up when they can. We will see what trails need the work and where the snow level is at a little closer to the weekend.

    I really appreciate all the hard work every single person put in this weekend. I also understand other people had prior commitments and could not make it. If you were not able to make it please offer a word of thank you to all that did the next time you see them.

    Time To Ride,
    Richard
    Disciples of Dirt mountain bike club
    IMBA Club


    The Forest Service counts both actual time on trail and travel time to location as volunteer hours. I usually only turn in 1 hour max of travel time per vehicle per direction.

    Trail Maintenance Report for March 19th – 21st, 2004.

    Friday: Alpine Trail, from road 683 down to road 5828, & from road 683 up to Tire Mtn trail.
    Volunteers: Richard Sweet, Lauri Sweet, Bert Ojerio, Kate Ojerio, Randy Dreiling, Even Turner, Dave Allen, Brice Gary, Keavy Cook, Jaini Crawford & Damien Kruziki.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Report: Trail Clear from road 683 down, 2 trees between 683 and Tire Mtn junction.
    Time: 8:00AM-3:00PM; 7 hours x 9 people and 11:00-3:00 = 4 hours x 1 person Total: 67 hours
    Travel Time: 2 hours x 4 vehicles = 8 hours

    Trail Maintenance Time for Friday: 67 hours
    Travel Time for Saturday: 8 hours
    Amount of volunteer time including travel time: 75 hours

    Saturday: Middle Fork Trail- Sand Prairie to Butcher Knife Creek
    Volunteers: Bert Ojerio, Riley Holmes, Boyd Piebenga, Damien Krusiki, Richard Sweet, Abe Schafermeyer, Britta, Kate Ojerio, Andy.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-2:30PM; 4.5 hours x 10 people Total: 45 hours
    Report: Trail Clear

    Saturday: Middle Fork Trail- Butcher Knife Creek up 2 miles.
    Volunteers: Brandon Reed & Tom Letsinger.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-12:30PM; 3.5 hours x 2 people Total: 7 hours
    Report: Trail clear of all debris and trees, and brushed. 1 tree half way to next road crossing. With debris on tread for the middle ˝-3/4 of trail.

    Saturday: Young’s Rock Trail- Campers Flat up 1.5 miles
    Volunteers: Brandon Reed & Tom Letsinger.
    Work Done: Debris removal, drainage work, brushing.
    Time: 12:30PM-2:30PM; 2 hours x 2 people Total: 4 hours
    Report: Trail clear of all debris and trees, and brushed. (Trees above 2nd road crossing)

    Saturday: Middle Fork Trail- Indigo Springs area
    Volunteers: Scott Taylor, Steve Shuman, Jack Chilberto, & April.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-6:00PM; 9 hours x 4 people Total: 36 hours
    Report: Trail clear of all debris and most trees, and brushed. Still a couple trees to cut out.

    Saturday: Eugene to Crest-below road 207
    Volunteers: Lauri Sweet, Jessica Nunley, Wes Stephens
    Work Done: Debris removal, drainage work, Minor trail reconstruction, brushing.
    Time: 9:00AM-2:30PM; 5.5 hours x 3 people Total: 16.5 hours
    Report: Trail clear of debris and brushed.

    Saturday: Eugene to Crest- Heckletooth section
    Volunteers: Ryan Ojerio, Tim Kaiser, John Hartland, Mike Albert, Adam Steffen, Jeff Amon, Alan Debur.
    Work Done: Debris removal, drainage work, Minor trail reconstruction, brushing.
    Time: 9:00AM-2:30PM; 5.5 hours x 4 people and 7 hours x 3 people Total: 43 hours
    Report: Trail clear of debris and trees from upper road crossing above Heckletooth Mtn to within ˝ mile of Heckletooth. Middle section around Heckletooth, still has trees and debris. Lower section by road 207 mostly clear of trees and debris.

    Trail Maintenance Time for Saturday: 151.5 hours
    Travel Time for Saturday: 30 hours
    Amount of volunteer time including travel time: 181.5 hours

    Sunday: Larison Creek Trail
    Volunteers: Jim Fischer, Damien Kruziki, Boyd Piebenga, Abe Schafermeyer, Tom Letsinger
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 8:30AM-3:30PM; 7 hours x 5 people, Total: 35 hours
    Report: Trail clear of debris, trees and brushed. 1 root wad hole approx 1/4 mile from cove, minor tread work and temporary crib work done.



    Sunday: Tire Mountain Trail
    Volunteers: Dave Hallock, Justin Mitchell, Don Person, Candy Walker, Steve Strickland, Ted Wade, Allan Bennett.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-3:00PM; 5.5 hours x 3 people, 6 hours x 4 people Total: 40.5 hours
    Report: Trail clear of debris, trees and brushed up to top switchback. 1 large tree still down at 1st switchback, was trimmed and a safe route made around it.

    Sunday: Winberry Divide Trail
    Volunteers: Lauri Sweet, Jack Chilberto, April, Glenn Ziemski, Lisa Lemoreaux, Richard Sweet, Wes Stephens.
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-3:00PM; 6 hours x 1 person, 3 hours x 4 people, 1.5 hours x 2 people Total: 21 hours
    Report: Trail clear of debris, trees and brushed for 1.5 miles from west trailhead. Numerous small trees, and allot of debris the rest of trail. Still needs brushing, tree removal and debris removal.

    Sunday: Larison Rock Trail
    Volunteers: Matt Bergerson, Alan Debur, Brandon Reed, Christa Olsson (with kids), Richard Sweet and Wes Stephens
    Work Done: Debris removal, drainage work, tree removal, Minor trail reconstruction, brushing.
    Time: 9:00AM-2:00PM; 5 hours x 3 people, 2 hours x 3 person Total: 21 hours
    Report: Trail clear of debris, trees and brushed. 2 trees still down approx ˝ way between top and bottom trailheads.

    Sunday: Alpine Trail, below 5828
    Volunteers: Richard Sweet and Wes Stephens
    Work Done: Debris removal, tree removal, Minor trail reconstruction, brushing.
    Time: 12:00PM-1:30PM; 1.5 hours x 2 people Total: 3 hours
    Report: Trail clear of debris, trees and brushed.

    Trail Maintenance Time for Saturday: 120.5 hours
    Travel Time for Saturday: 20 hours
    Amount of volunteer time including travel time: 142.5 hours

    Other Trail work:
    Volunteer: Allan Bennett
    Work Done: Brushing, small tree removal (hand saw), minor tread work, debris removal.
    Trails: Hardesty and Sawtooth.
    Total Time: 4 hours

    Volunteer: Scott Taylor
    Work Done: Tree removal
    Trails: Middle Fork of the Willamette
    Total Time: 8 hours

    Volunteer: Bert Ojerio
    Work Done: Brushing, small tree removal (hand saw), debris removal
    Trails: Flat Creek
    Total Time: 1 hour

    Volunteer: Ken (from Oakridge)
    Work Done: Tree removal
    Trails: Middle Fork of the Willamette
    Total Tie: 8 hours

    Volunteer: Richard Sweet
    Work Done: Brushing, small tree removal (hand saw), debris removal
    Trails: Middle Fork of the Willamette, Winberry Tie, Winberry Divide
    Total Time: 3.5 hours

    Trail Maintenance Time, Other: 24.5 hours
    Travel Time: 6 hours
    Amount of volunteer time including travel time: 30.5 hours

    The overall numbers:
    Total Number of individual volunteers: 45 (see list below)
    Total Number of volunteers through the weekend: 60
    Total Weekend Volunteer Trail Maintenance time: 363.5 man hours
    Total Miles of trail opened up: Approx. 55 miles, does not include loops but just singletrack.
    Including Travel Time: 429.5 volunteer hours




    Weekend Volunteers
    Richard Sweet (3 days)
    Lauri Sweet (3 days)
    Damien Kruziki (3 days)
    Bert Ojerio (2 days+ 1 morning)
    Kate Ojerio (2 days)
    Alan Debur (2 days)
    Brandon Reed (2 days)
    Abe Schafermeyer (2 days)
    Boyd Piebenga (2 days)
    Tom Letsinger (2 days)
    Wes Stephens (2 days)
    April (2 days)
    Jack Chilberto (2 days)
    Randy Drylene
    Brice Gary
    Dave Allen
    Even Turner
    Jaini Crawford
    Keavy Cook
    Al Bennett
    Andy
    Brian
    Britta
    Jeff Amon
    Jessica Nunley
    John Harland
    Mike Albert
    Riley Holmes
    Tim Kaizer
    Adam Steffen
    Ryan Ojerio
    Scott Taylor
    Steve Shuman
    Christa Olsson
    Glen Ziemski
    Lisa Lamoreaux
    Matt Bergerson
    Dave Hallock
    Don Person
    Justin Mitchell
    Candy Walker
    Steve Strickland
    Ted Wade
    Jim Fischer
    Ken (from Oakridge)

    Next trail work weekend April 30th - May 2nd, hope to see you there, until then keep the rubber side down.

    Richard Sweet
    Disciples of Dirt Trail Cordinator
    IMBA Club
    Just the Pictures

    The Shop


    The Blog

    Time To Ride,
    General Coonskins

  2. #2
    mtbr member
    Reputation: Scottie Rox's Avatar
    Join Date
    Jul 2003
    Posts
    158
    I live in eugene and would like to help out on 4/30/4.
    A local trail in need of rehab is Haverstey and Goodman, lots of downed trees.
    What trail did you guy just clear?

  3. #3
    Tree Hugger
    Reputation: Sasquatch's Avatar
    Join Date
    Dec 2003
    Posts
    2,946
    [QUOTE=Scottie Rox]I live in eugene and would like to help out on 4/30/4.
    A local trail in need of rehab is Haverstey and Goodman, lots of downed trees.
    QUOTE]

    Scottie, if you want to help out with trailwork this weekend, check out the info below. I'll be going up to Oakridge for saturday and sunday, and camping Sat night, but I could give you a ride out to Oakridge (and find you a ride home at the end of the day) or you might find a ride with other Disciples of Dirt riders if you planned to come up on sunday. Let me know if you need a lift or directions.

    Later, Sasquatch

    Pasted from the DOD webpage:

    So this weekend marks another in a series of 3 day weekend trail
    work parties I have planned for the year. We will be doing trail
    throughout the year but this is the last opportunities I will have
    to be up there for 3 days. Most, if not all, of the future dates
    will probably be less formal and more spur of the moment. So if you
    haven't been up there yet I have allot of reason's you should, I can
    give you excuses to show up, what will happen if you don't and your
    friends see you riding their freshly cleared trail, etc.... If you
    have made it out before your work has been so appreciated it is hard
    to convey it, I have had so many thank you's it makes me proud to
    call the DOD and Oakridge my riding community.

    This by far not your last chance but a really good one for you to
    come on up and enjoy the company of your fellow mountain bikers,
    find out what trails are clear, do some good work and eve ride your
    bike.

    Over the past few weeks we have been working to find out what still
    needs work and what is out of snow. As the snow level goes up we are
    happy to see most of the trails are in better shape than the lower
    portions have been in allot of cases, some it has been the opposite
    with more trees down up high than lower.

    So here is the plan.

    We will meet each day at the Trailhead Coffee House in Oakridge. If
    you want to do breakfast please show up at least an hour before hand
    to order and eat. If you show up only 30-45 minutes before hand
    please don't order a full on breakfast and instead get some muffins
    and drink to go. It isn't fair to the other people that got there on
    time to wait for you to finish your food and not be ready to go
    until 9:30.

    Friday: Meet at 8:00AM ready to go. We will work for 4-5 hours and
    then go for a 2-3 hour moderate ride.

    Saturday: Meet at 9:00AM ready to go. You have a choice here, if you
    want to ride please make sure to let me know so I can put you with
    the right group. I do have a couple projects that will require a
    whole day worth of work, so if you can only make it for one day it
    would be great if you could be out there most of the day but I will
    understand if you want to ride-I would. Plan on 3-5 hours of trail
    work with a ride or 4-8 hours without a ride.

    Sunday: Meet at 9:00AM ready to go. You have a choice here, if you
    want to ride please make sure to let me know so I can put you with
    the right group. I do have a couple projects that will require a
    whole day worth of work, so if you can only make it for one day it
    would be great if you could be out there most of the day but I will
    understand if you want to ride-I would. Plan on 3-5 hours of trail
    work with a ride or 4-8 hours without a ride.


    Bring your lunch, plenty of water, sun screen, work boots, gloves,
    tools, etc.... As well as a change of clothes and something to wash
    down with if you get poison oak. I will probably have Clif Bars and
    as before if you want a sandwich please email me and I will do my
    best to have the Trailhead make one up for beforehand, probably
    around $5 each.

    Now for the fun part, it is party time. Kona Bicycles has donated
    allot of swag to give away, see Bert's post earlier last week. We
    will be having a raffle from starting around 6:00PM at the Trailhead
    Coffee house, you have to have done trail work one of the past
    couple trail work weekends we have put on or this weekend to be
    eligible, and you must be present to win. Trailhead is doing
    something special for dinner, BBQ or something, not sure on how much
    $$ yet, so expect to hang out, drink a beer or three, eat some great
    food and have a good time. There is suppose to be entertainment, yes
    Boyd and Abe will be there worms and all, as well as some locals.

    I do need to know who might be coming up with a chain saw and what
    day so I can figure out the best place to send you and a small crew.

    I am sure I am forgetting to tell you something but for now, it's
    time to ride.
    Richard
    I love mankind - it's people I can't stand. ~Charles M. Schulz

Similar Threads

  1. Trail clearing Disciples
    By General Coonskins in forum Singlespeed
    Replies: 11
    Last Post: 11-25-2011, 11:37 AM
  2. Disciples of Trail Work
    By General Coonskins in forum Singlespeed
    Replies: 1
    Last Post: 03-23-2004, 09:49 AM
  3. Up coming Grand Junction trail work.
    By tiggerider in forum Colorado - Front Range
    Replies: 0
    Last Post: 03-08-2004, 10:30 PM
  4. Upcoming Holy Cross trail work days
    By tiggerider in forum Colorado - Western Slope
    Replies: 6
    Last Post: 03-03-2004, 08:12 AM

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.