• 07-20-2018
    Timothy G. Parrish
    Stumphouse Tunnel Trail Work Day 7/20
    For anyone not on FB who may be interested, there's a trail work day tomorrow at Stumphouse Tunnel tomorrow to work on Phase 2 of the trail system. Meet at the Stumphouse Tunnel main parking area (through first gate, stay left). Do not pay fee. 9 AM until 1 or 3 PM. Bring your bike to ride after. Weather should be good until after we're done.

    For those on FB:

    https://www.facebook.com/events/2146910755531727/?ti=cl

    Thanks.

    Sent from my MotoG3 using Tapatalk
  • 07-22-2018
    SCxXxMTB
    I was out of town so I couldnt attend, but how did it go? Hows everything looking out there?
  • 07-22-2018
    Timothy G. Parrish
    Quote:

    Originally Posted by SCxXxMTB View Post
    I was out of town so I couldnt attend, but how did it go? Hows everything looking out there?

    Only 5 people showed, including trail builder, mayor of Walhalla, PCF coordinator, a friend, and myself. Heavy rain right before probably scared people away.

    Phase II construction has begun. We worked on a small connector trail on the north side, connecting the phase one part to the Palmetto Trail.

    There will be more trail work days throughout the remainder of the year. I'll try to remember to post them up here.

    Sent from my MotoG3 using Tapatalk