G.E.A.R.S. Trail Building Events- Mtbr.com
Results 1 to 4 of 4
  1. #1
    mtbr member
    Reputation:
    Join Date
    Jul 2008
    Posts
    955

    G.E.A.R.S. Trail Building Events - Update

    Hello Everyone,

    We had a great turn out last week at Greenbush and completed two new connector
    trails between loops one and two. We'll be continuing trail building
    at Greenbush Saturday morning. We'll be departing the lower lot at
    8:00am sharp with our vehicles and heading out to Forest Drive which
    is off Hwy. 67. It is the road that the prison is on. About a mile
    down the road there is an old logging road on the right side which is
    blocked by a snow fence. We'll park our cars there and shuttle tools
    and people in with just a couple cars via the logging road which takes
    us to within a five minute walk of loop 4. We should be there about 8:10 if you want to catch the shuttle otherwise you'll need to walk in.

    Also Team Fond du Lac/ Oshkosh Cyclery will be holding a trail clean-up at Keikahfer Park outside of Fond du Lac. They are meeting at the park at 8:30 on Saturday.


    Randy
    Last edited by DekerfTeamST; 04-16-2010 at 05:32 AM.

  2. #2
    mtbr member
    Reputation:
    Join Date
    Jul 2008
    Posts
    955

    Nice Turn Out 4-10-10

    We had thirteen people show this past Saturday. Two more than the first Saturday. Let's add a few more next week. Same time same place. We looked like an army heading into and out of the woods. Unfortunately our army needs to grow. That loop 4 is a nasty battle ground. We were some tired soldiers leaving the battlefield and we only put a small dent into it. What we got done is some quality work though. Keep it up folks we'll win this war and finish the loop. Come join the fight and help us finish this bad boy.

  3. #3
    mtbr member
    Reputation:
    Join Date
    Jul 2008
    Posts
    955

    Trail Work 4-17-10

    Hello Everyone,

    Trail work continues tomorrow at Greenbush. We're departing the lower
    lot at 8:00am sharp to continue work on loop 4. As last week we will
    again be accessing the loop from the logging road off Forest Drive.
    We should be there no later than 8:15 if you want to meet us there
    also. From there we'll pile into a few vehicles and head to the
    worksite.

    We've been getting a pretty good group of volunteers over the last few
    weeks and I thank everyone who have been attending. Unfortunately
    Loop 4 has alot of work to be done yet. This is going to be a great
    addition to the existing loops once complete. It would be great to be
    enjoying this trail over summer so we're going to have to step up our
    efforts and to do that we need more people. The completion of this
    loop is dependant on the volunteer effort as there is no DNR work
    being done presently. We have plenty of tools we just need bodies.
    Hoping to see some new faces tomorrow. We'll work and then play so
    bring your bikes.


    Thanks,

    Randy Wegener, G.E.A.R.S.
    Last edited by DekerfTeamST; 04-16-2010 at 05:56 AM.

  4. #4
    mtbr member
    Reputation:
    Join Date
    Jul 2008
    Posts
    955

    Greenbush Trail Work, May 1st

    Hello Everyone,

    Trail work continues tomorrow at Greenbush. We're departing the lower lot at 8:00am sharp to continue work on loop 4. As in past weeks we will again be accessing the loop from the logging road off Forest Drive. We'll be missing some folks because of the Iola race but I hope we can fill the voids with some new faces.

    Randy

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.