Lynn Woods Update 10.17.07- Mtbr.com
Results 1 to 1 of 1
  1. #1
    mtbr member
    Reputation: dieselbikes's Avatar
    Join Date
    Dec 2004
    Posts
    303

    Good job! Lynn Woods Update 10.17.07

    With the help of the local biking community, Dieselbikes was able to complete 100% of our fifth and final trail day in Lynn Woods for the 2007 season. As usual, this was another backbreaking project but our main goal and a few extras were accomplished.

    A section of trail that connects Ridge Run to the beginning of the Ballfield trail (section 5E) just past Mary Ellen Drive was severely eroded with pieces of asphalt and concrete dumped around the trail area. It was decided to close this section of trail and re-route to more stable ground for long-term use. This section was in poor condition and really did not offer anything fun in terms of technical riding...

    Visit the link below for the full story and trail work pictures:
    http://www.dieselbikes.com/trails/ly...trail_work.htm
    Last edited by dieselbikes; 10-18-2007 at 03:04 AM.
    For Information Regarding The New England Mountain Bike Scene:
    Visit DIESELBIKES.com

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.