    New question here. New step-up I'm building...

    Im new to these and i have never done one. I was wondering how far the take off jump should be from the top of the table. I am NOT done so the take off jump needs about 3x's as much dirt. I laid a shovel across that is 3 1/2 feet to show you what ive done. Just need an estemate. The other demensions are 7 1/2 feet across the top and the hight of the table is 2 feet. Again, I am not done and the wood is not rotten, I need to saw off the ends.
    Attached Images Attached Images

  2. #2
    the goose is loose!
    Reputation: rm_racer's Avatar
    Join Date
    Feb 2006
    Posts
    1,276
    i would say move that jump back about a foot. it's hard to tell though with the jump not being complete yet.

  3. #3
    mtbr member
    Reputation: xKREDx's Avatar
    Join Date
    Aug 2006
    Posts
    2,261
    Cool.
    Quote Originally Posted by shredder111
    Can I paint your rockring, silly bun salad?

  4. #4
    mtbr member
    Reputation: MTB-AHOLIC's Avatar
    Join Date
    Oct 2005
    Posts
    462
    yeah ill add more dirt and post some more pix. thanks!

  5. #5
    Glad to Be Alive
    Reputation: SHIVER ME TIMBERS's Avatar
    Join Date
    Jan 2004
    Posts
    42,929
    brace the center of those boards...they look dry rotted and look like they would break easily........move the jump back another foot.....soon you will have that about 8 to 10 feet back
    the trick is ENJOYING YOUR LIFE EACH DAY, don't waste them away wishing for better days

  6. #6
    wajt... what ?
    Reputation:
    Join Date
    May 2006
    Posts
    85
    Thats a wee lil jump.

  7. #7
    mtbr member
    Reputation:
    Join Date
    Jun 2004
    Posts
    4,441
    where's the jump. all I see is half a dock without water.
    "What would happen to the Weather Channel's ratings if people werent scared anymore?"

  8. #8
    dirt rules
    Reputation: sittingduck's Avatar
    Join Date
    Apr 2005
    Posts
    3,050
    Looks like something to bunnyhop to me.
    you will need to dig down about 10 feet for that to be much of a step up. Your lip should be at least a few feet high, which will make what you have more like a step-down.
    Maybe build your lip first next time, then it will be a bit more obvious to you.

  9. #9
    mtbr member
    Reputation: MTB-AHOLIC's Avatar
    Join Date
    Oct 2005
    Posts
    462
    Yeah I know its small. Ive never done one and thought i'd just build one behind my house in a little trail i built in this washed out area. The area is a bit small and so everything is sorta small. Im trying to tie it in with a wall ride. pix below...(of the wallride). The "step up" comes before the wallride. My main goal is to make a flowy little trail behind my house that I can try tricks and stuff on, so I don't have to ride so far away to get to it.
    Attached Images Attached Images

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.