Black Canyon Trail Work Day next weekend. We will be working on the section of BCT up near Bumble Bee in the continuation of extending the trail furture north. We will be meeting up near Bumble Bee instead of the previous Black Canyon City Trail Head. See below for directions.

Date: October 17, 2009
Time: 8:00 AM
Meet At: BCT crossing at Bumble Bee Rd
Work Location: South of crossing
Contact Information: Bob@bctaz.org

Activities: Construct non-motorized trail using accepted trail building techniques and hand tools along previously flagged route.

This is a physical activity requiring certain health and safety considerations. Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.

Bring sun screen, your own soft or sports drinks and snacks. Bottled water and lunch will be provided.

Tools to be used: Pulaski, McCloud, shovel, pick mattock, limb lopper and pruning saw. Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.

Directions: Take Bumble Bee Rd, exit 248, from I-17. Follow signs to the parking area, approximately 3/4 mile.

For Info: http://www.bctaz.com/gpage4.html