    BCT trail build this Sat.

    Time to give some back for those who have used the trail

    Date: Sat, October 17, 2009


    Time: 8:00 AM



    Meet At: BCT crossing at Bumble Bee Rd



    Work Location: South of crossing



    Contact Information: Bob@bctaz.org



    Activities: Construct non-motorized trail using accepted trail building techniques and hand tools along previously flagged route.



    This is a physical activity requiring certain health and safety considerations. Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.



    Bring sun screen, your own soft or sports drinks and snacks. Bottled water and lunch will be provided.



    Tools to be used: Pulaski, McCloud, shovel, pick mattock, limb lopper and pruning saw. Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.



    Directions: Take Bumble Bee Rd, exit 248, from I-17. Follow signs to the parking area, approximately 3/4 mile.





    Workday Schedule
    October 17, 2009

    November 14, 2009

    December 12, 2009

    January 9, 2010

    February 13, 2010

    March 13, 2010

    April 10, 2010

  2. #2
    Just another half mile...
    Reputation: Epicrider's Avatar
    Join Date
    Jan 2004
    Posts
    1,064
    Thanks Jeff for Posting. You beat me to the punch. Sonia and I will be there
    >

    Quote Originally Posted by AKA Monkeybutt
    Time to give some back for those who have used the trail

    Date: Sat, October 17, 2009


    Time: 8:00 AM



    Meet At: BCT crossing at Bumble Bee Rd



    Work Location: South of crossing



    Contact Information: Bob@bctaz.org



    Activities: Construct non-motorized trail using accepted trail building techniques and hand tools along previously flagged route.



    This is a physical activity requiring certain health and safety considerations. Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.



    Bring sun screen, your own soft or sports drinks and snacks. Bottled water and lunch will be provided.



    Tools to be used: Pulaski, McCloud, shovel, pick mattock, limb lopper and pruning saw. Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.



    Directions: Take Bumble Bee Rd, exit 248, from I-17. Follow signs to the parking area, approximately 3/4 mile.





    Workday Schedule
    October 17, 2009

    November 14, 2009

    December 12, 2009

    January 9, 2010

    February 13, 2010

    March 13, 2010

    April 10, 2010

  3. #3
    mtbr member
    Reputation: AKA Monkeybutt's Avatar
    Join Date
    May 2006
    Posts
    1,318
    Info from Bob...

    Date: Saturday, October 17, 2009

    Time: 8:00 AM

    Meet At: Location described in “Directions” below

    Work Location: Arrastre Creek Segment of the Black Canyon Trail


    Directions: From Interstate 17, either direction; take exit 248 (Bumble Bee) toward Bumble Bee, proceed approximately 1 mile to parking area on left side of the road. Directional signs will be posted.

  4. #4
    mtbr member
    Reputation: AKA Monkeybutt's Avatar
    Join Date
    May 2006
    Posts
    1,318
    Anyone going?

    No time to help build one of the best desert trails in AZ but plenty of time to complain about Ipods and such?

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.