Power plant site proposed next to Kepler Bradley-Crevasse Moraine- Mtbr.com
Results 1 to 1 of 1
  1. #1
    mtbr member
    Reputation:
    Join Date
    Aug 2005
    Posts
    54

    Power plant site proposed next to Kepler Bradley-Crevasse Moraine

    In the latest of their harebrained schemes to pick the worst possible options in just about anything they do, Matanuska Electric is proposing to use the gravel pit just east of that Valhalla of rides, KepMo, for a new carbon-dioxide emitting coal-fired power plant!

    See this Daily Blues article: http://www.adn.com/news/alaska/matsu...-8768666c.html and then go to the MEA site that shows that the gravel pit is one of their favorite options (cheapest because of EZ fuel availability): http://mea.coop/images/stories/gener...onsitesmap.pdf I wish they had a puking 'smile' button!

    And we thought plastic bags scattered in trees of CrevMo was bad?? Think coal dust blowing all over the woods, and new high transmission lines with clearcut corridors hacked thru the best riding in SC AK like their cut thru the west core of KepMo last year!

    Where is the newly expanded City of Palmer in restricting industrial uses in that area? (Sure it was a gravel pit, but it can be revegged!)

    Attached Images Attached Images

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.