Results 1 to 4 of 4
  1. #1
    mtbr member
    Reputation: MMcG's Avatar
    Join Date
    Jul 2003
    Posts
    9,591

    Hey Kirk - how's that Heckler Project coming along?

    Did you get it done and if so, any ride time on it yet?

  2. #2
    Mr.650b - Mr.27-5
    Reputation: Kirk Pacenti's Avatar
    Join Date
    Sep 2006
    Posts
    1,630
    Quote Originally Posted by MMcG
    Did you get it done and if so, any ride time on it yet?
    Unfortunately not... I know the wheel will fit, but there is too much going on here to get it done anytime soon. I may skip it and just get a purpose built FS bike.
    Last edited by Kirk Pacenti; 11-05-2007 at 02:40 PM.

  3. #3
    mtbr member
    Reputation: MMcG's Avatar
    Join Date
    Jul 2003
    Posts
    9,591
    Do you have to build up the whole bike is that it? Otherwise it would just be a simple wheel swap right?

  4. #4
    mtbr member
    Reputation: poppy's Avatar
    Join Date
    Jan 2006
    Posts
    978
    It is not really relevant because it's an old Heckler frame (2000) which is very different from the new ones and even the one before but i have it lying around with no use and that what I was thinking of doing.
    The only problen might be the tire I'm not sure 2.35 will fit inside the swing arm, it comes also with a little bridg on the upper part that need to be modify.
    This frame have far more then 10.000 miles already but still in good shape.
    I'll give it a try and might bring it back to life.

Members who have read this thread: 0

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

THE SITE

ABOUT MTBR

VISIT US AT

© Copyright 2019 VerticalScope Inc. All rights reserved.