Results 1 to 2 of 2
  1. #1
    mtbr member
    Reputation:
    Join Date
    Aug 2006
    Posts
    44

    Henry's Ridge Trail Work Dec 14

    Hi All,

    A workparty has been posted on the Evergreen Mountain Bike Alliance site for the "new trail" at Henry's Ridge. This will take place on Dec 14 from 9:00 am to 3:00 pm. The location is the same Water Tower Park as the trail portion of the recent Evergreen Trail Building Class (which took place on Nov 16). The trail built so far looks great and with your help it will look even better when it is done. Sign up at the Evergreen Mountain Bike Alliance website. If you cannot attend no problem and thanks for spreading the word.

  2. #2
    mtbr member
    Reputation:
    Join Date
    Aug 2006
    Posts
    44
    Thanks to the 13 (plus three trail dogs) who made it out to the workparty. Lots of good work done to the trail. The trail is now known as "Feeder Line". A workparty at the same location will be posted again for late January for those who missed this last one. Hope to see you there.

Similar Threads

  1. Replies: 11
    Last Post: 11-08-2013, 07:08 AM
  2. Replies: 21
    Last Post: 01-12-2013, 11:57 PM
  3. Replies: 34
    Last Post: 12-29-2012, 09:42 PM
  4. Henry W. Coe Volunteer Trail Work Dates Nov-Jan
    By Sorcerer in forum California - Norcal
    Replies: 7
    Last Post: 10-20-2011, 04:26 PM
  5. Replies: 13
    Last Post: 03-13-2011, 11:01 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •