Results 1 to 7 of 7
  1. #1
    Just roll it......
    Reputation: ebxtreme's Avatar
    Join Date
    Jan 2004
    Posts
    7,450

    Fanatik Bikes Presents: Galbraith FR Trailday - Saturday April 25th

    Yo,

    Just a head's up. The WMBC will be having our next FR trailday.

    Sponsor: Fanatik Bikes
    What: Lower Scorpion Fixes and new Upper Luge section
    When: Saturday April 25th
    Time: 9:45 Meet time.
    Where: Parking lot off of Lake Padden Near Galbraith Lane.

    Details:
    Fanatik Bikes is sponsoring this day and will provide a lite breakfast and lunch. The plan is to put in a few reroutes on lower scorpion and we'll also add a few berms and jumps. The goal is to open up sightlines on Lower Scorp a bit, speed it up with some well placed bermage. We'll also be adding a new connector to the Luge (to replace Dan's) which will go in directly across from a new exit to Scorpion.

    We have had incredible turnouts for each build day this year - averaging 30+ people, so let's keep that trail karma going into summer with galby trails ready to rip!

    More info. from Hawk:
    Only a couple more trail crew work dates left.
    • April 25th - Scorp & Luge maintenance and reroutes sponsored by Fanatik
    • May 9th - General buffing, hit building sponsored by Hidden Wave
    • June 13 or 14th - End of the year BBQ/Raffle.


    Remember, for those that show up and help, their names get added into a raffle drawing at the end of the year BBQ in June. The more you help, the better your chances of winning something cool. Backpacks and jerseys from DaKine and a TransAM frame from Transition Bikes are among the items trail crew volunteers will receive. Come on out and increase your chances or picking up some cool gear.

    Cheers,
    EB
    Last edited by ebxtreme; 04-17-2009 at 11:58 PM.

  2. #2
    Build More = Ride More
    Reputation: YoPawn's Avatar
    Join Date
    Mar 2008
    Posts
    1,443
    Quote Originally Posted by ebxtreme
    Yo,

    Just a head's up. The WMBC will be having our next FR trailday.

    Sponsor: Fanatik Bikes
    What: Lower Scorpion Fixes and new Upper Luge section
    When: Saturday April 25th
    Time: 10:45 Meet time.
    Where: Parking lot off of Lake Padden Near Galbraith Lane.

    Details:
    Fanatik Bikes is sponsoring this day and will provide a lite breakfast and lunch. The plan is to put in a few reroutes on lower scorpion and we'll also add a few berms and jumps. The goal is to open up sightlines on Lower Scorp a bit, speed it up with some well placed bermage. We'll also be adding a new connector to the Luge (to replace Dan's) which will go in directly across from a new exit to Scorpion.

    We have had incredible turnouts for each build day this year - averaging 30+ people, so let's keep that trail karma going into summer with galby trails ready to rip!

    More info. from Hawk:
    Only a couple more trail crew work dates left.
    • April 25th - Scorp & Luge maintenance and reroutes sponsored by Fanatik
    • May 9th - General buffing, hit building sponsored by Hidden Wave
    • June 13 or 14th - End of the year BBQ/Raffle.


    Remember, for those that show up and help, their names get added into a raffle drawing at the end of the year BBQ in June. The more you help, the better your chances of winning something cool. Backpacks and jerseys from DaKine and a TransAM frame from Transition Bikes are among the items trail crew volunteers will receive. Come on out and increase your chances or picking up some cool gear.

    Cheers,
    EB
    Hey, if you guys ever hold a non-official work day on a Sunday, I would be more than happy to come up from Seattle and help, since I ride Galbraith often during the summer.

    My Saturdays are booked for Duthie work.

  3. #3
    Just roll it......
    Reputation: ebxtreme's Avatar
    Join Date
    Jan 2004
    Posts
    7,450
    Quote Originally Posted by YoPawn
    Hey, if you guys ever hold a non-official work day on a Sunday, I would be more than happy to come up from Seattle and help, since I ride Galbraith often during the summer.

    My Saturdays are booked for Duthie work.
    We usually alternate them, but I messed up the last one by putting it on a Saturday since it worked better for the Transition boys.

    Yeah, most of the HLC is at Duthie on Saturdays as well.....as long as folks are out making it happen somewhere!

  4. #4
    mtbr member
    Reputation:
    Join Date
    Mar 2007
    Posts
    40
    last saturday baker will be open. next one fo sho.

  5. #5
    Just roll it......
    Reputation: ebxtreme's Avatar
    Join Date
    Jan 2004
    Posts
    7,450

    Please note new time in the original post.

    ...............

  6. #6
    Just roll it......
    Reputation: ebxtreme's Avatar
    Join Date
    Jan 2004
    Posts
    7,450

    Bumpy bump

    Holy phock.....I got out for a killer ride this April 20th with some buddies and hit a big chunk of the mountain and everything was running killer!

    Come on out and let's get Scorp and the Luge dialed before summer hits.

    Word.
    EB

  7. #7
    Just roll it......
    Reputation: ebxtreme's Avatar
    Join Date
    Jan 2004
    Posts
    7,450
    Many thanks to the Fanatik crew and everyone that came out for this trailday!! Props to Matt (Lizardlake) who was battling a 102 fever to come out and lead a big trailday. Holy crap, I've been blown away with the turnout this season for the traildays and how much has gotten done. I think folks will agree that the effort is reflective in how well the trails are draining and schralping.

    Not only did Fanatik take great care of everyone with breakfast, lunch and post-work bevvies, but they had 5 folks busting their butts all day on the trail. Matt probably has the final tally, but I'd say we had between 35-40 folks again.....I think I counted 5 ladies too. What started with gray skies ended with beautiful sunshine and a killer day for building.

    Progress:
    We got the new exit to Scorp and the new entrance to Luge cut in and both are looking great and probably 90% from dialed. On the exit to Scorp, the re-routed sections were totally buffed with drainage and you carry a bunch of speed out of it. We've got to tweak the berms (more dirt and shaping) before the new step up jump to carry more speed. Currently, you carry too much speed out of the rerouted section into the berm and scrub most of the speed before the jump. Also, we're not sure if the pumpers will stay or not. Once dialed, I think folks are going to enjoy the new exit to Scorp much more than the previous straight shot to the road.

    On the new Luge section, there are several new hits and 3 or 4 berms. The entire section is down to mineral gold and a few folks built a killer drainage using a culvert where a natural spring popped up. Russ B. and a crew of folks built a killer new table in the middle of the section that looks NICE (they moved a ton of dirt)! The exit still needs a bit more love. You can now ride directly into the pre-existing Luge (you have to hop over a log - we'll cut/split that up and use for rungs), but that will get work this week.

    Again, thanks to everyone for giving up a day of riding to give back to the hill. Kathy Salisbury was taking pics during the day, so I'll see if I can grab those from her.

    Next trail day is May 9th.

    We'll be buffing, building jumps and making tweaks where necessary to several trails like Scorpion, Evo, Mullet, Luge.

    Braaap!
    EB

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •