Results 1 to 2 of 2
  1. #1
    mtbr member
    Reputation: kinsler's Avatar
    Join Date
    Sep 2011
    Posts
    301

    Redd Road- survey tape

    Anyone know what the city is up to back behind the high school? There was a large area just northwest of the school that had been bulldozed, including a section of trail and there is survey tape all over the place.

    Apparently flattening out and destroying the desert to excessively widening trans-mountain isn't enough.

  2. #2
    mtbr member
    Reputation:
    Join Date
    Jan 2004
    Posts
    416
    sad and obvious answer....development. Supposedly (heard from someone els), the Franklins development that is behind Hornedo and Lundy will be done once this section is complete except for a possible trail head somewhere around there. Sadly, for thos that like to ride Mikes trail (one of my favorite trails in the area), some sort of rerout will be necessary.

    THe wish ful thinking on my part is to continue the Little Moab trail to near where the Mike trail was bulldozed. A single track trail there would be sweet.

    If you feel strongly about this, get involved with a local group such as BMBA (who had the parking lot at Redd built to help preserve the trail system).

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •