Results 1 to 2 of 2
  1. #1
    sw1
    sw1 is offline
    mtbr member
    Reputation:
    Join Date
    Nov 2008
    Posts
    9

    Lykens - Rattling Creek Trail Work Sun Nov 18

    I posted up on the RCST blog about an impromptu trail work day this Sunday. The
    plan is to install new bridge treads on the large bridge on Rattling Creek trail
    from last years storm damage and bridge retrieval, and also to address about 10 downfalls on Doc Smith from Sandy. If there is a large enough turnout, we can split up and address a few other issues too. There is more info on the blog, you can comment/sign up there or PM me here.

    rcst1 dot blogspot dot com

    Thanks!!!

  2. #2
    sw1
    sw1 is offline
    mtbr member
    Reputation:
    Join Date
    Nov 2008
    Posts
    9

    it's on!!!

    things are looking good for Sunday, the more the merrier. The focus will be on the bridge treads and tree removal/trail cleanup. Should be able to knock it out fairly quickly. Come on down and support your local Imba Epic trails!! Meet at 8AM at the East End Lot.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •