    Lynn Woods Update 06.04.05

    They said it couldn?t be done, but WE all did it! Lynn Woods Maintenance Volunteers were able to complete 100% of our third trail maintenance project today. This work was completed (see pictures below) on the trail leading from Bow Ridge to the Wolf Pits. A section of the trail was trenched with the installation of a 10? Diameter PVC pipe to re-directed water under the trail. A trench was then dug parallel to the trail allowing the water to drain without causing trail erosion.

    We were also able to armor a section on the lower half of this trail that has been severely eroded from consistent water running down it. The trail is not prefect but now is fun for bikers to climb and ride down. This section will be monitored over the summer with a returning Trail Day visit in September to complete the finial armoring requirements.

    With phase 1 completed, we will work with Park Management on achieving approval to install a Ladder Bridge at the base of this trail to cross the flood zone near the Wolf Pits.

    This was a big project and I must say that everyone work there ASS off to finish. At no point did we lose sight of the project, completing it in a record 3 hours!

    I want to extend my personal thanks to each individual (listed below) that helped complete this project. I look forward to see everyone again in future trail builds and/or maintenance projects.

    Tom ? Lynnfield, MA
    Mike ? Andover, MA
    Chris ? Lynn, MA
    Igor ? Swampscott, MA
    Tina ? Lynn, MA
    Tom ? Somerville, MA
    Jim ? Lynn, MA
    Simon ? Somerville, MA
    Brian ? Rowley, MA
    Tim ? Rowley, MA
    Dan ? North Attleboro, MA
    Attached Images Attached Images
    For Information Regarding The New England Mountain Bike Scene:
    Visit DIESELBIKES.com

  2. #2
    Black Lion
    Reputation: yogreg's Avatar
    Join Date
    Dec 2003
    Posts
    4,432

    Wow!

    Big props to you and your crew for this great accomplishment. I can't wait to check out the section first hand.

    Thankyou
    Greg
    Voltron

  3. #3
    mtbr member
    Reputation: dieselbikes's Avatar
    Join Date
    Dec 2004
    Posts
    303
    The trail is not perfect but is dry. Still a small section of water on the lower half because it is coming out from under the ground, but this will be fixed in the fall.

    Give the water time during the summer to work is way through the new path.

    Thank you for the great comments.
    For Information Regarding The New England Mountain Bike Scene:
    Visit DIESELBIKES.com

Similar Threads

  1. Lynn Woods Update 05.20.05
    By dieselbikes in forum Massachusetts
    Replies: 4
    Last Post: 05-21-2005, 08:52 AM
  2. Lynn Woods Update 05.10.05
    By dieselbikes in forum Massachusetts
    Replies: 0
    Last Post: 05-10-2005, 10:53 AM
  3. Lynn Woods Update 05.01.05
    By dieselbikes in forum Massachusetts
    Replies: 3
    Last Post: 05-05-2005, 03:35 PM
  4. Lynn Woods Update 04.26.05
    By dieselbikes in forum Massachusetts
    Replies: 2
    Last Post: 04-26-2005, 10:17 PM
  5. Lynn Woods Update 04.19.05
    By dieselbikes in forum Massachusetts
    Replies: 1
    Last Post: 04-19-2005, 07:24 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •