On Saturday July 23, 2005, Dieselbikes will be holding a Trail Maintenance day in Lynn Woods. This trail day has been approved by the Lynn Woods Park Management. Saturday will begin phase one of repairing the Water Tower Trail Network. We require 15 volunteers (or more) to complete the job on Saturday. This work site is close to the parking lot! Here is what you need to know:

Start Time and Meeting Place:

Everyone should meet at the ball field parking lot (Great Woods Road Entrance) between 9:30am and 9:55am. We will be leaving the parking lot at 10:00 to head to the job site. If you can not make it there by 10:00, come any way and just ride out to the work site. We will put you to work.

Mapquest Link
http://tinyurl.com/d2g5g

Estimated Project Time:

We accept this project to take 3 hours to complete. Once complete, we will ride for the rest of the day!!!

What to Bring:

Bring your own bug spray, food, water, pair of work gloves and your bike!

What WE are going to do:

The map below shows the job site area. A section of Trail leading from the Water Tower to Ox Pasture Road requires repair to ensure long term sustainability. This Trail section was in a flood area and moved over two years ago. However its new route has deteriorated and now requires repair.

We will be building a bridge out of natural rock and stone to elevate a section of Trail and armoring the entrance and exits of this Trail Section with flat rock plate. There is plenty of rock and stone located around this Trail. It will be a labor intensive day but fun if you never built a rock/stone bridge before.

Tools will be provided for this work day. Please PM or e-mail (frankd@dieselbikes.com) if you need further information.