    Lynn Woods Bridge Build Trail Day (Saturday: November 12th)

    On Saturday November 12, 2005, Dieselbikes will be holding a Bridge Build Trail Day in Lynn Woods. This bridge build day has been approved by the Lynn Woods Park Management. Saturday will continue efforts in repairing the lower half of Bow Ridge near the wolf pits. We require as many volunteers as possible to complete the job on Saturday. Here is what you need to know:

    Start Time and Meeting Place:

    Everyone should meet at the ball field parking lot (Great Woods Road Entrance) between 9:00am and 9:30am. We will be leaving the parking lot at 9:30 to head to the job site. If you can not make it there by 9:30, come any way and just ride out to the work site. We need the volunteers for this project and will put you to work.

    Mapquest Link
    http://tinyurl.com/d2g5g

    Estimated Project Time:

    We accept this project to take 5 hours to complete. Because this project will be one of the largest we have completed this year a group ride maybe optional depending on how tired everyone is.

    What to Bring:

    Dress appropriately for the weather. Long pants, long sleeve shirts and work boots are suggested. Bring your own food, water, pair of work gloves and your bike (optional)! At this point in time Dieselbikes does not provide food or drink.

    What WE are going to do:

    The map below shows the job site area. The work site is located near the Wolf Pits (Map intersection D3-3). Many who ride in Lynn Woods know that a section of the Power Line Trail starting from the Wolf Pits (D3-3) and leading to the trail split for Bow Ridge (D3-4) runs through a wet area. This area is dry during the summer, but in the spring, fall and even winter months, this area is flooded with water.

    We are going to remove the current decaying bridge and install a 72 foot long ladder bridge. This bridge will cross the complete length of the wet area and be 36 inches wide to suit all users of the park.

    All bridge material will be pre-cut and drilled for easy assembly the day before. Tools will be provided for this work day. All material and tool will be driven half way out to the job site due to the condition of the fire road. Volunteers will need to carry the material and tools the rest of this distance to the work site. Please PM or e-mail (frankd@dieselbikes.com) if you need further information.

    LetБ─≥s get this bridge completed in one day! We need your support!

    Work site map:


    Wolf Pits when it is wet:


    Current Bridge we are replacing:
    For Information Regarding The New England Mountain Bike Scene:
    Visit DIESELBIKES.com

  2. #2
    Authority is dead!
    Reputation: Lucky13's Avatar
    Join Date
    Jan 2004
    Posts
    1,812
    I would suggest moving it to the beginning of next season. One winter less for it can't be bad.
    [SIZE=5]For the love of Oi[/size]

    [size=6]Rent a house at Attitash[/size]

  3. #3
    mtbr member
    Reputation: dieselbikes's Avatar
    Join Date
    Dec 2004
    Posts
    303

    Trail Day Reminder

    Just a reminder for this weekends Trail Day. Weather looks like it will work out.

    Thanks for your support!

    Diesel
    For Information Regarding The New England Mountain Bike Scene:
    Visit DIESELBIKES.com

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •