Page 2 of 2 FirstFirst 1 2
Results 26 to 27 of 27
  1. #26
    mtbr member
    Reputation:
    Join Date
    May 2011
    Posts
    686
    Probably 3 XT level build fs bikes. I was quoted between 12-15K to redo our master bath (with poured concrete shower floor pan) and watched youtube videos and did it myself. I think I was about $3K total in materials, the most expensive being glass frameless shower doors at $1500 alone. It took me two weeks, but not too hard.

  2. #27
    Light freak
    Reputation: scar's Avatar
    Join Date
    Jun 2005
    Posts
    2,406

    This is a bike forum....





    *****

Page 2 of 2 FirstFirst 1 2

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •