I guess it's that time of the year where everyone is having a trail work day. Just happened by the BCTC website and found this info.

Date: October 12, 2013


Time: 9:00 AM

Meet At: Location described in “Directions” below

Work Location: Copper Mountain Loop, near Mayer AZ

Activities: Construct non-motorized trail using hand tools.

This is a physical activity requiring certain health and safety considerations. Please be aware of your personal physical condition, wear appropriate attire, such as long sleeves and hat if you are sun sensitive, gloves and sturdy footwear.

Bring sun screen, your own soft or sports drinks. We will provide bottled water and lunch.

Tools to be used: Pulaski, McLeod, shovel, pick mattock, limb lopper, and pruning saw. Tools will be provided, but you are welcome to bring your own if they are marked for easy identification.

Directions: From Interstate 17, either direction; take exit 262 (Highway 69) north toward Prescott, AZ. Proceed approximately 4.2 miles to the turn on the west side(left) of the highway. We will meet at the parking area and carpool from there (equestrians can ride horses from the parking area).

Heading south on Hwy 69; pass the Mayer fire station and Old Sycamore Rd. Proceed approximately .5 mile to the turn on the west side (right) of the highway.

Directional signs will be posted to the parking area.

Trail Work Events